TM 5-5420-226-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 10 of 10)
Top Deck Insulator Panel Replacement (Sheet 4 of 4)
3.
Using drift pin to line up screw holes,
use 7/16 inch socket to install 19 screws
(H) and washers (J) holding supports
(K), spacers (L), retainer plate (M),
seal (N), and support (P).
Fasten two hoist chains to end (Q) of
4.
top deck (D).
Using hoist, raise end (Q) of top deck
5.
(D) until top deck is standing on end
(R).
6.
Swing hoist about 1 foot in direction of
arrows, slowly lower end (Q) of top deck
(D) until top deck (D) is resting with insula-
tor panel facing down.
7.
Remove two hoist chains from ends (Q)
of top deck (D).
Position seven straps (S) on frame with
8.
holes alined.
Manually start seven screws (T) through
9.
straps (S) into frame (U).
Using 7/16 inch socket,
tighten seven screws (T).
Install top deck door
Install top deck
TA169442
End of Task
16-30