TM 5-5420-226-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 7 of 10)
Top Deck Insulator Panel Replacment (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Installation
TOOLS:
7/16 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
Drift pin
Hoist (capable of lifting 4,000 pounds)
SPECIAL TOOLS: Sling (Item 31, Chapter 3, Section 2)
Two
PERSONNEL:
PRELIMINARY PROCEDURES:
REMOVAL:
Using 7/16 inch socket, remove seven
screws (A) and strap (B) from frame
(C).
Fasten two hoist chains to end (D) of
top deck (E).
TA169439
Go on to Sheet 2