• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'TM 5-5420-227-24' by LOGSA - Page 35 of 574
'TM 5-5420-227-24' by LOGSA - Page 37 of 574

Launcher M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicie-Launched Scissoring Type, Class 60 Page Navigation
  19    20    21    22    23  24  25    26    27    28    29  
img
. . . . .
TM 5-5420-227-24
Maintenance Checks and  Services for M48A5 AVLB Launcher -
Preventive
Continued
Location
Not Fully Mission
Procedure
Item to
Interval
Item
Capable if:
Check/Service
No.
Remove holddown cylinder armor
Hold-down
Semiannual
16
Cylinder and
(page 3-247). Inspect holddown cylin-
Armor
der armor for damage.
Any Class III
Check holddown cylinder for leaks
Extend and coat holddown cylinder
plug with grease.
Install overhead cylinder armor (page
3-218), tongue cylinder armor (page
3-227), boom mount hose armor (page
3-116), and holddown cylinder armor
(page 3-247).
Perform retrieval procedure (TM 5-
5420-226-10).
Change 2
2-12.8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.