• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'TM 5-5420-227-24' by LOGSA - Page 428 of 574
'TM 5-5420-227-24' by LOGSA - Page 430 of 574

Launcher M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicie-Launched Scissoring Type, Class 60 Page Navigation
  412    413    414    415    416  417  418    419    420    421    422  
img
TM 5-5420-227-24
BOOM -OU T RI GGER ASSEM BLY REPLACEM EN T (Sheet 2 of 3)
Remove four pin retainers (C) and two
2.
brackets (D).
Attach lifting device and sling to boom-
3.
outrigger assembly (E).
4.
Have technician operating lifting device raise
sling to take up slack.
5.
Using 7/16 inch socket, remove four grease fittings (F).
6.
Using hammer and drive pin, drive out two pins (G).
While two technicians guide boom-outrigger assembly (E), have technician operating
7.
lifting device slowly lift boom-outrigger assembly (E).
8.
Move boom-outrigger assembly (E) to desired location and remove lifting device.
Using hammer and drive pin, drive out six bushings (H).
9.
INSTALLATION:
1.
Position six bushings (A) in boom-outrigger assembly (B).
2.
Using hammer and wooden block, drive in six bushings (A).
Attach lifting device to boom-outrigger assembly (B).
3.
While two technicians guide boom-outrigger assembly (B), use lifting device to mO Ve
4.
boom-outrigger assembly (B) into position on vehicle.
5.
Using hammer and drift pin, drive two pins (C) into position.
Place four pin retainers (D) and two support brackets (E) on vehicle.
6.
TA170499
Go on to Sheet 3
4-21


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.