TM 5 -5 4 2 0 -2 2 7 -2 4
Se c t ion I l. PU M P-CLU T CH AN D V ALV E BAN K
PU M P-CLU T CH DRI V E REPLACEM EN T (She e t 1 of 4 )
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Cleaning and Inspection
Installation
TOOLS: 3/4 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Snap ring pliers (inside)
Puller kit
Arbor press
3/8 in. socket head screw key
Wooden block 1 x 4 in. 3 in. long
SUPPLIES:
REFERENCES:
PRELIMINARY PROCEDURES:
REMOVAL:
1.
Place wooden block under clutch (A).
2.
Using screw key, remove setscrew (B).
Using socket, remove four screws (C) and
3.
away.
TA170501
Go on to Sheet 2
4-23