TM 5-5420-228-24
RESERVOIR RETURN CHECK VALVE (CV8) REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
NOTE
Before installation, use pipe tape on all male threads. Start
tape on second thread so tape will not enter hydraulic system.
Use adjustable wrench to install
1.
check valve "CV8" (A) with flow arrow
pointing toward tee (B).
Holding check valve "CV8" (A) with
2.
adjustable wrench, use 1-3/4 inch
wrench to install bushing (C) and
attached parts.
3.
Holding elbow (D) with adjustable wrench) use 1-1/2 inch wrench to install hose assembly
"BB" (E).
4.
Service hydraulic reservoir (LO 5-5420-202-12).
5.
6.
Check for hydraulic leaks and correct as necessary.
7.
Service hydraulic reservoir (LO 5-5420-202-12).
End of Task
TA251517