TM 5-5420-228-24
PUMP-TO-VALVE BANK HOSE ASSEMBLY (CW) REPLACEMENT (Sheet 2 of 2)
Using 1-1/2 inch wrench to hold adapter
4.
(F), use 1-5/8 inch wrench to remove
quick disconnect (A).
Using 1-1/2 inch wrench to hold adapter
5.
(F), use 1-3/8 inch wrench to disconnect
hose assembly (B) and collar (G).
INSTALLATION:
NOTE
Before installation, use pipe tape on all male
pipe threads. Start tape on second thread so
tape will not enter hydraulic system.
Remove all caps and plugs as necessary
during installation.
Using 1-1/2 inch wrench to hold adapter
1.
(A), use 1-3/8 inch wrench to install
hose assembly (B).
Using 1-1/2 inch wrench to hold
2.
adapter (A), use 1-5/8 inch wrench
to install quick disconnect socket
(C) and collar (D).
Using fingers, connect quick disconnect
3.
socket (C).
Using adjustable wrench, install elbow
4.
(E) and collar (F) on valve bank (G).
Using 1-1/2 inch wrench, connect end
5.
of hose assembly "CW" (B) on elbow (E).
6.
Check for hydraulic leaks and correct as necessary.
7.
Service hydraulic reservoir (LO 5-5420-202-12).
8.
TA251586
End of Task
3-190