Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Improved Ribbon Bridge Ramp Bay (Contd).ITEM TONOT FULLYITEMCHECK/MISSIONNO.INTERVALSERVICEPROCEDURECAPABLE IF:TM 5-5420-278-100015 000015 00-58BeforeRight stabilizerassembly (5)Check for cracks, if bent, or if pins areloose or missing.Stabilizer is crackedor bent, or pins areloose or missing.59BeforeRight front trunnion (6)a. Check for structural damage.b. Ensure trunnion is properly securedin lock.a. Damage allowswater to enterponton. Any visiblehole will deadlinebay.b. Trunnion is notproperly secured inlock.6~
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business