Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-9
18
Before
Unfolding cable
assemblies (6)
Check for looseness, kinks, broken
strands, or compression.
Cables are loose,
kinked, or
compressed, or
broken strands are
noted.
17
Before
Hydraulic
lines (5),
connectors (4),
and loom (3)
a. Check for proper seating of
connectors.
b. Check lines for fluid leaks or
physical damage.
c. Check loom for physical damage.
a. Connectors are
not seated properly.
b. Any Class III
fluid leak is noted.
3
4
4
6
5