TM 5-5420-278-10
0020 00
0020 00-3
LOADING BAP FROM GROUND (Contd)
NOTE
Perform step f if BAP mounting ladder is not secured.
f. Raise sliding half of mounting ladder (11) up until stud (14) aligns with
stowage latch (12), then close latch (12) and install quick-release pin (13) on
stud (14).
NOTE
Perform step g if BAP air supply hose is disconnected
from stowage coupling.
g. Connect air supply hose (15) to stowage coupling (17) at side of BAP frame (16).
15
16
17
~
11
12
13
14