TM 5-5420-278-100024 000024 00-9FREE LAUNCH OF BAY (Contd)u. Set both BAP hold-down locks (12) in DISENGAGED position by pulling outhandles (13).v. Disconnect RCU cable (10) from receptacle (11), and stow remote control unit(14) and RCU cable (10) in stowage box (15).WARNINGAll personnel must stand clear of transporter prior toremoving safety pin from air release control valve lever.Once safety pin is removed, use caution not toaccidentally pull or catch lanyard or a premature freelaunch may occur. Failure to comply may result indamage to equipment or possible injury or death topersonnel.w. Just prior to backing transporter, carefully remove safety pin (17) fromcontrol valve lever (16).CAUTIONDo not exceed 4 ft (1.2 m) maximum fording depth ordamage to equipment may result.NOTE Perform step x if launch site bank height is 0, or performstep y if bank height is between 0 and 60 in. (152 cm). x. Back transporter into water to top of rear axle hubs, for free launch ofinterior bay, and to top of rear axle tire rims for free launch of ramp bay,then apply service brake (20), move transmission selector lever (19) to N(neutral), and pull PARKING BRAKE control (18) out.y. Back transporter up to river bank so that rear axle tires are approximately 2 ft (0.6 m) from edge of bank , then apply service brake (20), movetransmission selector lever (19) to N (neutral), and pull PARKING BRAKEcontrol (18) out.101112131617141518
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business