TM 5-5420-278-100024 000024 00-10FREE LAUNCH OF BAY (Contd)NOTEIf pulling lanyard does not release front lock pinassemblies, ensure BAP air hose is properly connected andvehicle air pressure gauge indicates adequate pressure.z. Launch bay by pulling lanyard (2) toward front of transporter.NOTEPerform step aa if pulling lanyard does not release frontlock pin assemblies. Assistant will help with step aa.Perform steps ab and ac if pulling lanyard releases bothfront lock pin assemblies but bay does not roll off BAP. aa. Launch bay by manually pulling lever (4) on both front lock pin assembles (3)simultaneously.1234CAUTIONDot not raise BAP more the 2 ft (0.6 m) or damage toBAP air supply and winch hoses will result.ab. Move HIGH IDLE switch (5) to ON, and hold joystick (8) in UNLOADposition until bay starts to roll, then release joystick (8).ac. Move HIGH IDLE switch (5) to OFF, and hold joystick (8) in LOAD positionuntil BAP is fully stowed and NO TRANSIT WHEN LIT indicator (7) is off.5768
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business