TM 5-5420-278-100025 000025 00-6CONTROLLED LAUNCH OF BAY (Contd)WARNINGKeep hands and fingers clear of front pin lockassemblies once set in the DOWN position. Failure tocomply may result in injury to personnel.NOTE Movement of the LHS hook arm may be necessary torelease the front pin lock assemblies.o. Set both front pin lock assemblies (1) in DOWN position by pulling back frontpin lock assembly (1) and depressing latch (2) to DOWN position untilengaged with latch pin (3).NOTEIn case of emergency while the RCU is in use, push thered POWER EMERGENCY STOP switch to shut downoperation of the LHS.p. Hold WINCH switch (4) in IN position until slack is removed from winchcable (5), then release switch (4).13245
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business