TM 5-5420-278-10
0025 00
0025 00-3
CONTROLLED LAUNCH OF BAY (Contd)
10
9
15
14
WARNING
The winch frame must be locked to the LHS hook arm
for a high-bank launch. Failure to comply may result in
damage to equipment or injury to personnel.
NOTE
When both winch frame lock levers are in the DOWN
position, the winch frame is locked to the LHS hook
arm. Perform steps g and h if levers are in the UP
position.
g. Remove quick-release pin (13) from stud (11) at both sides of winch frame (12).
h. Swing lever (15) down so that end of stud (14) is through hole in lever (15), and
install quick-release pin (13) on stud (14) at both sides of winch frame (12).
f. Check hold-down lock (10) at both sides of BAP to ensure they are in AUTO
ENGAGED position; handles (9) should be in.
11
12