TM 5-5420-278-10
0026 00
0026 00-15
HIGH-BANK LAUNCH OF BAY (Contd)
NOTE
Repeat steps aa through ay to high-bank launch
another bay or perform steps ay through bj to prepare
CBT for transit.
ay. Move HIGH IDLE switch (1) to ON position.
az. Hold MAIN FRAME switch (4) in UNLOAD position until main frame (17) is
fully extended, then release switch (4).
ba. Hold HOOK ARM switch (3) in LOAD position until main frame (17) is fully
extended, then release switch (4)
bb. Remove IRB hoisting gear from snatch block hook (9).
bc. Hold WINCH switch (2) in OUT position until winch pays out approximately
4 ft (1.2 m) of cable (7), then release switch (2).
bd. Move HIGH IDLE switch (1) to OFF position.
be. Remove snatch block (8) from winch cable (7).
bf. Disconnect cable hook (6) from end of extension assembly (5), and remove
extension assembly (5) from winch frame (10).
WARNING
Always wear leather gloves when handling winch cable.
Failure to comply may result in injury to personnel.
bg. While assistant maintains tension on winch cable (7), hold WINCH switch (2)
in IN position until hook holder (15) is seated in saddle (14), then release
switch (2).
bh. Move HIGH IDLE switch (1) to ON position, hold MAIN FRAME switch (4)
in LOAD position, and as main frame (17) moves into stowed position, move
HIGH IDLE switch (1) to OFF, then release switch (4).
bi. Hold HOOK ARM switch (3) in LOAD position until hook arm (16) is fully
stowed, then release switch (3).
7
14
15
16
7
17