WARNINGPushing ramp bay with BEB after disengagingtransverse upper couplings and ponton swivel hooksmay cause the bay to fold, and possible injury or deathto personnel may result.CAUTIONEnsure all gravel, rocks, mud, and other debris areremoved from openings at unfolding stabilizer mountingbrackets prior to folding bay. Failure to comply mayresult in jamming during folding operations.NOTEBEB operator will maintain bay alignment with CBTduring retrieval of bay.ag. Signal BEB operator to position bay (1) so connecting end is in line withwinch cable (2).ah. Connect cable hook (5) to bay lifting lug (4). Ensure latch (3) is closed.WARNINGEnsure bay is clear of boat crew personnel andobstructions before winching in bridge bay. Ensure allpersonnel are safely off bay before lifting. Failure tocomply may result in damage to equipment or possibleinjury or death to personnel.NOTEDuring bay retrieval in fast moving water or strongcrosswinds, it may be necessary to position a boat withthe push knees against the downstream bow to keepbridge bay aligned with transporter.TM 5-5420-278-100039 000039 00-10BAY RETRIEVAL (Contd)13452INTERIOR BAY SHOWN
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business