TM 5-5420-278-100042 000042 00-2LONGITUDINAL RAFTING PROCEDURE (Contd)b. Position downstream BEB (11) to hold raft assembly (10) in position.c. Position upstream BEB (4) adjacent to rafting brackets (9) with bow facingaway from near shore on upstream side of raft assembly (10).NOTEUse 1 in. (2.5 cm) manila/nylon rope for all lines.BEB operator will place boat controls in neutral oncebow line is secured.d. Connect bow line (2) to interior bay load receiving pin (1) closest to ramp bayand secure bow line (2) to port side bollard (3).e. Connect stern line (7) to interior bay load receiving pin (8) closest to rampbay, and secure stern line (7) to capstan (5).f. Take up slack in stern line (7) and tie off end of stern line (7) to stern bollard (6).1210113456789
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business