TM 5-5420-278-10
0042 00
0042 00-3
LONGITUDINAL RAFTING PROCEDURE (Contd)
g. Open both pump access covers (14) on ramp bay (13) facing near shore,
position pump control valve levers (12) in UP position, and raise ramp
bay (13).
h. Ground ramp bay
assembly (10) in place
with upstream
i. Position downstream BEB (11) adjacent to rafting brackets (15) with bow
facing away from near shore on downstream side of raft assembly (10).
13
14
15
4
10
11