TM 5-5420-278-100042 000042 00-3LONGITUDINAL RAFTING PROCEDURE (Contd)g. Open both pump access covers (14) on ramp bay (13) facing near shore,position pump control valve levers (12) in UP position, and raise ramp bay (13).h. Ground ramp bayassembly (10) in placewith upstream i. Position downstream BEB (11) adjacent to rafting brackets (15) with bowfacing away from near shore on downstream side of raft assembly (10).13141541011
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business