TM 5-5420-278-100066 000066 00-3CLEANING (Contd)f. Rusted Surfaces.NOTEAll parts subject to rusting must be lightly oiled aftercleaning and prior to storage (Item 5, WP 0072 00).Remove all evidence of corrosion.PAINTINGThe IRB bays will require touch-up of painted surfaces periodically. Touch-upbays as required. Bays are Chemical Agent Resistant Coating (CARC) painted;notify unit maintenance if entire bay requires painting.LOADING AND MOVEMENT OF EQUIPMENTa. Shipping Data Plate. A shipping data plate is mounted on the connectingends of each IRB-R and IRB-I. A silhouette of the side and end views of the bay isdepicted, and overall dimensions, lifting and tiedown points, and center of gravitylocations are given. (Refer to WP 0003 00.)b. Slinging Provisions. IRB slinging provisions enable lifting of the IRB-R orIRB-I for both normal lift and external lift by helicopter. To lift the bay, connectIRB hoisting gear to the load receiving pins marked LIFT/TIEDOWN, located ontop of the bay’s outer pontons when in the folded position. When the BAP is used,lift the bay and the BAP by connecting a suitable sling to the lifting eyes on theBAP. When the bay is tied down with the BAP, the tiedowns are to be attached tothe bay and not the BAP. The load receiving pin lift points are located inrelationship to the bay’s center of gravity.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business