Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 2. Unit Preventive Maintenance Checks and Services for Interior Bay (Contd). - TM-5-5420-278-24P_122
REMOVAL - TM-5-5420-278-24P_126
TM-5-5420-278-24P Common Bridge Transporter (CBT) M1977 and Bridge Adapter Pallet (BAP) M15 Manual
Page Navigation
79
80
81
82
83
84
85
86
87
88
89
TM 5-5420-278-24&P
0020 00
0020 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN
5420-01-470-5825
P/N 12478918;
INTERIOR BAY M17
NSN
5420-01-470-5824
P/N 12478919.
CABLE ASSEMBLY MAINTENANCE
REMOVAL, INSTALLATION, ADJUSTMENT
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit
(Item 3, WP 0135 00)
Materials/Parts
Dunnage
Four
cotter pins
(WP 0086 00)
Lubricating Oil
(Item 13, WP 0134 00)
Cap and plug set (Item 5, WP 0134 00)
Equipment Condition
Ramp bay removed from transporter
(TM 5-5420-278-10).
Travel latch and foldlock locked
(TM 5-5420-278-10).
Yokes fully retracted (TM 5-5420-278-10).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business