TM 5-5420-278-24&P
0021 00
0021 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
FRONT BELLCRANK AND REAR EYEBOLT REPLACEMENT
FRONT BELLCRANK REMOVAL, REAR EYEBOLT REMOVAL,
REAR EYEBOLT INSTALLATION, FRONT BELLCRANK INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Two cotter pins (WP 0088 00)
Two locknuts (WP 0088 00)
Locknut (WP 0089 00)
Grease (Item 10, WP 0134 00)
Equipment Condition
Travel latch and foldlock locked
(TM 5-5420-278-10).
Cable assemblies removed (WP 0020 00).