TM 5-5420-278-24&P
0024 00
0024 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
UNFOLDING STABILIZER AND BRACKETS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Grease (Item 10, WP 0134 00)
References
WP 0091 00
Equipment Condition
Outer ponton separated from inner ponton
(WP 0023 00).