TM 5-5420-278-24&P
0059 00
0059 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
PONTON LEAK TEST
INSTALLATION, REMOVAL
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Ponton leak detector (Table 2, Item 1,
WP 0135 00)
References
WP 0068 00
Equpiment Condition
Ramp bay or interior bay removed from transporter
(TM 5-5420-278-10).
Inner pontons separated and outer pontons unfolded
(WP 0023 00 or WP 0042 00) or bay unfolded in
water (TM 5-5420-278-10).