Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
LEFT PUMP/RIGHT PUMP
SHIPMENT AND LIMITED STORAGE INSTRUCTIONS FOR IMPROVED RIBBON BRIDGE (IRB)
TM-5-5420-278-24P Common Bridge Transporter (CBT) M1977 and Bridge Adapter Pallet (BAP) M15 Manual
Page Navigation
318
319
320
321
322
323
324
325
326
327
328
TM 5-5420-278-24&P
0078 00
0078 00-3/4 blank
HYDRAULIC SYSTEM SCHEMATIC
(Contd)
1.
PRESSURE RELIEF VALVE 508 PSI (35 BAR)
2.
VENTING VALVE 4-7 PSI (0.3-0.5 BAR)
3.
FLUID RESERVOIR
4.
SUCTION FILTER
5.
CHECK VALVE (NON-RETURN VALVE)
6.
PRESSURE
RELIEF VALVE
(SAFETY VALVE) 1450 PSI (100 BAR)
7.
HANDPUMP
8.
MEASURING CONNECTION ON HANDPUMP
9.
DIRECTIONAL CONTROL VALVE
POSITIONS:
DOWN
TRANSPORT/CROSSING
UP
DOWN FAST
10.
COUPLING
11.
CONNECTING HOSE BETWEEN TWO FLUID TANKS
12.
CONNECTING HOSE BETWEEN TWO CYLINDERS (BOTTOM SIDE)
13.
DOUBLE-ACTION WORKING CYLINDER
14.
PRESSURE
RELIEF VALVE
(SAFETY VALVE) 8412 PSI (580 BAR)
15.
SHUT-OFF VALVE
16.
MEASURING CONNECTION AND VENTING AT THE CYLINDER
17.
CONNECTING HOSE BETWEEN TWO CYLINDERS (HEAD SIDE)
18.
EXTERNAL CONNECTION (BOTTOM SIDE)
19.
EXTERNAL CONNECTION (HEAD SIDE)
A, B, 1, 2, 3, AND 4: PORT DESIGNATION
END OF WORK PACKAGE
neutral (11)
red (17)
yellow (12)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business