TM 5-5420-278-24&P
0018 00
0018 00-21
Table 1. Unit Preventive Maintenance Checks and Services for Ramp Bay (Contd).
ITEM TO
ITEM
CHECK/
EQUIPMENT NOT
NO.
INTERVAL
SERVICE
PROCEDURE
READY/AVAILABLE IF:
Figure 3. PMCS, Ramp Bay Unfolded.
7
CAUTION
Ensure longitudinal and
transverse couplings and swivel
hooks are engaged before
performing inspection.
NOTE
Perform items 37 through 47
with ramp bay unfolded and
secured, starting at front
(connecting end), proceeding
counterclockwise. (Refer to
figure 3.)
36
Semi-
Right outer
annually
ponton handrail
assemblies (8)
Inspect handrail assembly for missing or
damaged mounting hardware, rope and
deterioration of rope, snaphooks, and if
stanchion will lock in stowed and set
positions.
Missing or damaged
parts are found or
stanchion is not
operational.