TM-5-5420-279-10
3.13.1.9
Once all the approach ramps have been put in place from one transport frame repeat the
procedure for the other transport frame.
3.13.1.10 Using two personnel lift the approach ramp frames and store them on the empty flatrack.
3.13.1.11 Position 3 defile marker posts on either side of the bridge to form a lead onto the bridge
for traffic.
NOTE
Defile marker guide posts are driven into the ground by foot. The dogleg on the post being
used to push the post into the ground.
3.13.1.12 Wrap marker tape between the posts securing it in the defile marker post clip and tie back
to the ramp module.
3-100