TM-5-5420-279-10
Table 8.2 Operators PMCS (Before) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
5
6
1
2
3
4
4
Before
Slide frame
Check R clips are fitted correctly to
home bank end beam adapter plate
(1).
5
Before
Relax
Check that the relax mechanism
mechanism
shootbolts are locked in the lowest
position (2).
6
Before
Electrical
Check that the electrical enclosure is
enclosure
not damaged and secure (5).
7
Before
Tilt roller
(a) Check that the tilt roller is stowed
assembly
in the horizontal position (3).
(b) Check that the shootbolts are
secure and the R clips are in position
(4).
Class III leak is
(c) Check for hydraulic leaks.
evident.
8
Before
Front
Check the front launch beam (6) is
Launch
pinned and secured into launch
beam
frame.
8-9