TM-5-5420-279-10
Operators Tables
8.3.1.1
Refer to Table 8.1 through Table 8.5 for Operators Preventive Maintenance Checks
and Services (PMCS) for the launcher. The routing diagram will be of help to
complete the PMCS. It shows the general path an operator will follow to complete
the PMCS.
START
PMCS Walk-around
NOTE
PMCS instructions for the Launch Vehicle chassis can be found in TM 9-2320-364-10.