TM-5-5420-279-10
Table 8.2 Operators PMCS (Before) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
1
7
2
4
7
3
5
6
29
Before
A-frame raise
Check the A-frame raise cylinder
Class III leak evident.
cylinder
for hydraulic leaks (1).
Check security of ladder retaining
30
Before
A-frame
strap (2).
walkway
ladder
31
Before
Right hand
Check security of fender locking
fender
shootbolts (6) and R clips.
32
Before
A-frame fold
(a) Check bottom hinge locking
hinge
pin is inserted from the front (3).
(b) Check top hinge locking pin is
inserted from the rear (4).
(c) Check security of the two
hinge locking pins with R clips in
position (3) and (4).
33
Before
Slide frame
Check that the R/H slide frame
twist lock
twist lock is locked in position (5).
33.1
Before
Roller brake
(a) Check for signs of hydraulic
Class III leak evident.
leaks.
(b) Check roller brake assembly
Damage evident.
and piping for damage (7).