TM-5-5420-279-10
Table 8.5 Operators PMCS (After) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
1
3
2
130
After
L/H
Check L/H stabilizer leg energy chain
stabilizer
cables and hydraulic pipes (1) for:
leg
(a) Damage.
Damage evident.
energy
chain
(b) Hydraulic fluid leaks.
Class III leak evident.
(c) Ensure that cables and hydraulic
Crossed cables or
pipes are laying correctly (no crossed
pipes.
pipes or cables).
131
After
L/H rear
Check the rear mudguard extension (2)
Not secured with R
mudguard
is R clipped at the front and secured
clips and shootbolts.
extension
with shootbolt and R clip at rear.
132
After
A-frame
(a) Check that the A-frame hinge pins,
Hinge pins not fitted
hinge pins
top and bottom hinges, are fitted
correctly or not R
correctly.
clipped.
1. Top hinge (3) lower pin fitted from
front and R clipped.
2. Lower top hinge (3) pin fitted from
rear and R clipped.
8-44