TM-5-5420-279-10
Table 8.5 Operators PMCS (After) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
1
189
After
R/H crane
Check the R/H crane stabilizer leg
Damage evident
stabilizer
controls (1) for damage or hydraulic
class III leak evident.
leg controls
leaks.
8-62