14 Remove the pivot pin.
15 Thread a sling through the pivot pin hole of the far bank support, and connect
both ends to the crane hook.
WARNING
UNEXPECTED MOVEMENT OF EQUIPMENT. ENSURE ALL SHOOTBOLTS ON THE FAR
BANK SUPPORT ARE FULLY INSERTED AND LOCKED BEFORE LIFTING OPERATIONS
COMMENCE.
16 Using a crane lift the Far Bank Support clear, and remove the support bearing
pads from their stored position on the far bank support. Connect the two support
bearing pads to the far bank support into their deployed position.
17 Pack the Far Bank Support against the crane as described in Figure 11. 50.
15
Figure 11. 49 Method of Slinging Far Bank Support