TM-5-5420-279-10
11.10.1.1
Place the crane on wooden blocks to allow removal of the transportation feet.
11.10.1.2
Remove the transportation feet.
11.10.1.3
Lift the crane and align with the crane mounting points.
11.10.1.4
It may be necessary to adjust one or all of the crane mounting cams (Figure 11. 60
item 9) if the mounting points cannot be aligned with the brackets on the chassis
11.10.1.5
Release the cam-mounting bolt (Figure 11. 60 item 11) by knocking back the lock
11.10.1.6
Turn the cam mounting bolt (Figure 11. 60 item 11) counter clockwise until the cam
11.10.1.7
item 7).
11.10.1.8
11.10.1.9
11.10.1.10 Secure the locking plates with bolts (Figure 11. 55 item 2) and washers. Use thread-
locking compound on the bolts (2).
11.10.1.12 Tighten the cam mounting bolts (Figure 11. 60 item 11) and lock in place with the
11.10.1.13 Reconnect the five crane hydraulic couplings (Figure 11. 57 item 5) and screw on
clockwise.
11.10.1.14 Reconnect the electrical supply cable (Figure 11. 56 item 1) to the crane.
11.10.1.15 Reposition and secure the home bank end beam adapters.
11.10.1.16 Disconnect the lifting device and sling.
11.10.1.17 Switch the battery shutoff switch to the on position.
11.10.1.18 Functionally operate the crane in accordance with Chapter 3 Section IV Para 3.14.
11.10.1.19 Check for hydraulic leaks.