TM 5-5420-280-10
0007 00
PALLET CONTROLS AND INDICATORS (Contd)
H
ELECTRIC POWER SUPPLY CABLE -- When
powering pallet electrical
system using CBT, the NATO jumper cable is used as a power supply cable. To
connect this cable, remove dust cap from NATO slave receptacle and push
cable plug on receptacle until seated.
H
CABLE PLUG
NATO SLAVE
RECEPTACLE
DUST CAP
I
MAIN POWER SWITCH -- The main power switch connects/disconnects
electrical power to pallet electric system from pallet batteries and CBT
batteries, whichever are in use. To operate switch, remove dust cap and insert
key in switch. Turn key to the right to turn on power. Turn key to the left to
shut off power.
KEY
DUST CAP
DUST CAP
I
I
KEY
POWER ON
POWER OFF
0007 00-4