TM 5-5420-280-10
0013 00
LOADING PALLET FROM GROUND (Contd)
CAUTION
If the bridge halves are on the pallet, do not attempt to
load the pallet from the ground without the fastening
rods installed. Failure to comply may result in damage
to equipment.
NOTE
Perform step 5 if bridge halves are on pallet.
5. Install two fastening rods on each side of pallet (1) or, if fastening rods are
installed, ensure that they are properly tightened. Refer to WP 0008 00.
1
FASTENING
RODS
CAUTION
Assistant will act as a ground guide when backing up
CBT and during operation of the LHS. Failure to
comply may result in damage to equipment.
6. Back up CBT so that rear of vehicle is directly in line with pallet and
approximately 5 to 6 ft (1.5 to 1.8 m) away. Apply service brake (4), move
transmission selector lever (3) to N (neutral), and pull PARKING BRAKE
control (2) out.
2
4
3
0013 00-4