TM 5-5420-280-10
0013 00
LOADING PALLET FROM GROUND (Contd)
22. Remove two pallet hold-down bars (6) from stowed position, and connect
hook (8) on each hold-down bar (6) to CBT towing shackles (9). Tighten both
hold-down bars (6) and jamnuts (7).
7
6
8
9
23. Install two transload rollers on fixed axles. Refer to WP 0007 00.
END OF WORK PACKAGE
0013 00-9/10 blank