TM 5-5420-280-10
0024 00
TRANSLOADING PALLET FROM PALLETIZED LOAD SYSTEM TRAILER (PLST)
(Contd)
NOTE
Ensure shoring pads are installed with yellow paint
marks aligned.
30. Install left and right shoring pads (4) on mounting brackets (2) at both sides
of pallet frame (3), and tighten screws (1).
31. Connect pallet hold-down bars to CBT. Refer to WP 0007 00.
32. Raise fixed axles until transload rollers contact pallet frame. Refer to
NOTE
Assistant will help remove and stow transload roller bar.
33. Using 19-mm wrench, remove two screws (8), washers (7), and transload
roller bar (6) from lower support boom (5). Stow transload roller bar (6) and
mounting hardware in either pallet toolbox.
YELLOW ALIGNMENT
MARKS
1
1
2
TRANSLOAD
6
POSITION
4
3
7
8
5
6
7
8
END OF WORK PACKAGE
0024 00-12