TM 5-5420-280-10
0043 00
Preventive Maintenance Checks and Services (PMCS) for Pallet (Contd).
NOT FULLY
ITEM
ITEM TO
INTERVAL
PROCEDURE
MISSION
NO.
CHECK/SERVICE
CAPABLE IF:
11
Before
Hydraulic
Check hydraulic tubing on pallet for
Any tubing is
tubing (3) on
kinks, damage, loose mounting
kinked, damaged,
pallet frame
hardware, or leaking fittings.
mounting hardware
is loose, or Class III
leak is noted.
3
PALLET
FRAME
12
Before
Telescopic
a. Check telescopic tube for cracks or
a. Any cracks or
tube (5),
damage.
damage is noted.
rollers (4),
hydraulic
cylinder (6),
b. Check for loose or missing rollers.
b. Any rollers are
lines (8), and
loose or missing.
hoses (7)
c. Any damage or
c. Check hydraulic cylinder, lines,
Class III leak is
fittings, and hoses for damage or leaks.
noted.
4
8
5
6
7
0043 00-7