TM 5-5420-280-23&P
0008 00
Electrical System Troubleshooting (Contd).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
22. RCU WILL NOT LOWER NEAR-SHORE END OF BRIDGE (L18-H) (Contd)
Step 5. Check that KY1 and KY21 hydraulic control valve solenoid LED lights are lit when action
button 1 is depressed.
a. If all lights are lit on control valve solenoids, refer to malfunction 5 in Hydraulic System
b. Check operation of IQAN-XP and IQAN-XS LED lights. Refer to WP 0004 00 step h.
Step 6. Check to see if one or more control valve solenoid LED lights are out when action button 1
is depressed.
a. If light is out, check for 24 volts at control valve solenoid.
b. If connector has 24 volts, replace control valve solenoid or hydraulic control valve. Refer
c. If connector has no voltage, check wires at KL-1 buss bar pin 1 for KY1 control valve
solenoid and KL-1 buss bar pin 21 for KY21 control valve solenoid. Refer to Electrical
d. Check wire between KL-1 buss bar pins 1 and 21 and IQAN-XS connector pins 20 and 36.
e. Check wire between KL-1 buss bar pin 2 and IQAN-XP connector pin 37. Replace wire if
END OF TESTING
23. RCU WILL NOT RAISE LAUNCH BOOM TO TRAVEL POSITION (L20-H)
Step 1. Check that KY1 and KY19 hydraulic control valve solenoid LED lights are lit when action
button 1 is depressed.
NOTE
Potentiometer JR2 is used to stop launch boom at a set position in
the launching procedures.
a. If both lights are lit on control valve solenoids, check potentiometer JR2 position 1 to see
if damaged or out of adjustment. Adjust or replace potentiometer JR2. Refer to
b. If potentiometer JR2 is operating and control valve solenoid lights are lit, refer to
c. Check operation of IQAN-XP and IQAN-XS LED lights. Refer to WP 0004 00 step h.
Step 2. Check to see if one or more control valve solenoid LED lights are out when action button 1
is depressed.
a. If light is out, check for 24 volts at control valve solenoid.
b. If connector has 24 volts, replace control valve solenoid or hydraulic control valve. Refer
c. If connector has no voltage, check wires at KL-1 buss bar pin 1 for KY1 control valve
solenoid, KL-1 buss bar pin 19 for KY19 control valve solenoid, and KL-1 buss bar
pins 34, 35, and 48 for JR2 potentiometer. Refer to Electrical System Schematic (WP 0122
d. Check wire between KL-1 buss bar pin 1 and IQAN-XS connector pins 20. Replace wire if
e. Check wires between KL-1 buss bar pins 19, 34, 35, and 48 and IQAN-XP connector pins
36, 15, 17, and 1. Replace wires if damaged. Refer to WP 0053 00.
END OF TESTING