TM 5-5420-280-23&P
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
LAUNCH BEAM LIFTING EYE AND SWIVEL BLOCKS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Winch cable disconnected if top bridge half
lifting eye is to be replaced.
Refer to TM 5-5420-280-10.
Materials/Parts