TM 5-5420-280-23&P
LAUNCHER MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
LAUNCH BOOM REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge pallet removed from CBT and placed on
dunnage. Refer to TM 5-5420-280-10.
Lifting device
Lower support roller assembly removed.
Sling or chains
Upper roller block assemblies removed.
Materials/Parts
Launch boom rope guide roller removed.
Bearing shaft manifold removed.
Launch boom swivel drive removed.