• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL INFORMATION
Figure 2. Depiction of Bridge Launch (2 of 2).

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  1    2  3  4    5    6    7    8  
img
TM 5-5420-280-23&P
0001 00
GENERAL INFORMATION (Contd)
CBT LOADED WITH BRIDGE AND BRIDGE PALLET IS BACKED INTO POSITION ON NEAR SHORE.
PIN WHEEL DRIVE UNIT ADVANCES LOWER BRIDGE HALF INTO COUPLING POSITION.
BRIDGE HALVES ARE COUPLED TOGETHER.
Figure 2. Depiction of Bridge Launch (1 of 2).
Change 1
0001 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.