• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 4. BRIDGE MAINTENANCE
BRIDGE HALF REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  190    191    192    193    194  195  196    197    198    199    200  
img
. . . . .
TM 5-5420-280-23&P
0018 00
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
BRIDGE HALF REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Forward Repair System (FRS)
Four
(Table 1, Item 2, WP 0206 00)
Equipment Condition
Lifting device
Sling Endless (Table 2, Item 3, WP 0206 00)
Unload pallet to ground. Refer to
Chains or cables
TM 5-5420-280-10.
Dunnage
Bridge fastening rods removed. Refer to
TM 5-5420-280-10.
Materials/Parts
Two locknuts (WP 0157 00)
0018 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.