TM 5-5420-280-23&P
0041 00
TRANSPORT ROLLERS REPLACEMENT (Contd)
NOTE
Removal and installation of right and left transport rollers are
performed the same way. Left side forward transport rollers are
shown.
REMOVAL
1. Remove two screws (6), lockwashers (7), washers (8), bracket (5), and roller (3) with shaft (4) from
mount (10) on telescopic tube (9). Discard lockwashers (7).
2. Slide shaft (4) out of two bushings (2) and roller (3).
3. If damaged or worn, remove two bushings (2) from roller (3).
4. Repeat steps 1 through 3 to remove other transport roller from telescopic tube.
INSTALLATION
NOTE
Apply a light coat of grease to bushings and shaft at installation.
1.
If removed, install two bushings (2) on roller (3).
2.
Slide shaft (4) in bushings (2) and roller (3).
NOTE
Ensure that all mounting hardware is tightened to metric
standards unless otherwise noted. Refer to metric torque limits in
3.
Install end of shaft (4) on bracket (5) and bracket (1) on telescopic tube (9) with two washers (8),
4.
Repeat steps 1 through 3 to install other transport roller on telescopic tube.
5.
Install bridge halves on bridge pallet. Refer to WP 0018 00.
2
1
3
4
6
2
5
7
8
10
9
END OF WORK PACKAGE
0041 00-2