• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOWER SUPPORT BOOM CYLINDERS REPLACEMENT - Continued
LOWER SUPPORT BOOM REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  504    505    506    507    508  509  510    511    512    513    514  
img
. . . . . . . . .
TM 5-5420-280-23&P
0097 00
LAUNCHER MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
LOWER SUPPORT BOOM REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Equipment Condition
Tools and Special Tools
Bridge pallet removed from CBT and placed on
Forward Repair System (FRS)
dunnage. Refer to TM 5-5420-280-10.
(Table 1, Item 2, WP 0206 00)
Bearing shaft manifold removed.
Lifting device
Refer to WP 0092 00.
Sling
Hydraulic lines removed. Refer to WP 0071 00.
Chain
Launch boom swivel drive removed.
Materials/Parts
Refer to WP 0094 00.
Grease (Item 8, WP 0205 00)
Cap and plug set (Item 3, WP 0205 00)
Four O-rings (WP 0162 00)
0097 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.