TM 55-1945-205-10-20017 00 40017 00INSTALL TOWING BRIDLE:,1*Be sure no other floating objects are nearby that could come in contact with the soldier while installing the towing bridle. Do not work alone. Failure to observe these precautions could result in death or injury to personnel.1.Using forklift and forklift adaptor, position towing bridle (8) over end rakes (9) of RRDF.2.Attach towing bridle (8) to flexor receiver inserts (2).3.Remove the two 2 in. shackles (10) and pins (11) from the ends of the mooring bridle legs (12).4.Attach each mooring bridle leg 2 in. shackles (10) and pin (11) to each flexor insert 2 in. shackle (13).INSTALL TOWING LIGHTS1.Remove towing lights from BII container.2.Install batteries in towing lights.3.Place a towing light with green lens on right side of RRDF.4.Place a towing light with red lens on left side of RRDF.5.Place a towing light with amber lens on back of RRDF.6.Place a towing light with white lens on front center of RRDF.END OF WORK PACKAGE81010121312229911
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business