TM 55-1945-205-10-20019 00 10019 00OPERATOR MAINTENANCEROLL-ON/ROLL-OFF DISCHARGE FACILITYSAFETY EQUIPMENT, LIFELINE AND DUNNAGE MATSOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00)Life Preserver, Vest (Item 33, WP 0119 00)Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00)Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)Helmet, Safety (Item 29, WP 0119 00)Life Ring With Light and Stanchion (Item 20, WP 0118 00)Personnel RequiredSeaman 88KPREPARATION FOR USE - INSTALLATION OF SAFETY EQUIPMENT AND DUNNAGE MATSINSTALL LIFELINE:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death.Beware of other craft or objects coming alongside while working outboard installing the keeper plate and bolt on deck fittings, as the possibility exists of falling overboard. Failure to observe these precautions could result in death or injury to personnel.1.Install vertical deck fitting (1) into turn tubes on modules (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business