OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
SAFETY EQUIPMENT, LIFELINE AND DUNNAGE MATS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0121 00)
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Life Ring With Light and Stanchion (Item 20, WP 0118 00)
Personnel Required
Seaman 88K
PREPARATION FOR USE - INSTALLATION OF SAFETY EQUIPMENT AND DUNNAGE MATS
INSTALL LIFELINE
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
Beware of other craft or objects coming alongside while working outboard installing
the keeper plate and bolt on deck fittings, as the possibility exists of falling
overboard. Failure to observe these precautions could result in death
or injury to personnel.
1.
Install vertical deck fitting (1) into turn tubes on modules (2).