TM 55-1945-205-10-2
0020 00 1
0020 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
GENERATOR CONTAINER
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0121 00)
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Gloves, Chemical (Item 24, WP 0119 00)
Plug, Ear (Item 43, WP 0119 00)
Materials/Parts
Antiseize Compound (Item 3, WP 0120 00)
Personnel Required
Seaman 88K
PREPARATION FOR USE - INSTALLATION OF TACTICAL QUITE GENERATOR CONTAINER
ON PLATFORM
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
All personnel must wear hearing protection during tactical generator operation.
Failure to observe this precaution could result in permanent hearing loss.
1.
Lift generator container onto RRDF platform.
2.
Position generator container in desired location.
3.
Tie generator container at four corners to RRDF platform using tie down straps.
REMOVE STEPS FROM GENERATOR CONTAINER
1.
Secure the generator container access door in open position.
a.
Loosen turnbuckle on the right side of step assembly until hook is free from round bar.
b.
Remove hook from round bar and stow.
2.
Pull steps from container to allow access.
3.
Close generator container access door.