TM 55-1945-205-10-2
0029 00 1
0029 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
GENERATOR CONTAINER
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Industrial (chipping, chemical) (Item 26, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Gloves, Chemical (Item 24, WP 0119 00)
Extinguisher, Fire (10 lb) (Item 17, WP 0119 00)
Materials/Parts
Spill Clean-Up Kit, Hazardous Material (Item 54 WP 0119 00)
Personnel Required
Seaman 88K
OPERATING PROCEDURES - TRANSFERRING FUEL FROM GENERATOR CONTAINER BASE FUEL
TANK TO DAY FUEL TANK
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
Ensure ISO container and generator are grounded before beginning refueling
operation. Failure to observe these precautions could result in serious
injury or death.
Hot fueling of generators while they are operating presents a safety hazard and
should not be attempted. Failure to observe this warning could result in serious
injury or death to personnel.
1.
Transfer fuel from the 1000 gallon tank to the day tank using the auxiliary electric fuel pump.
127(
Fire extinguisher and spill kit must be present during transfer of fuel from base
tank to day tank.
a.
Observe the fuel gauge (1) to determine the fuel level in the day tank.
b.
Rotate the master switch to the PRIME & RUN AUX FUEL position (2).