TM-55-1945-205-10-2
0037 00 1
0037 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
DUNNAGE MATS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Tee Handle (Item 10, WP 0118 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - REMOVAL OF DUNNAGE MATS
REMOVE DUNNAGE MATS FROM PLATFORM
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Using the provided tee handle (1), loosen nut (2) on dog (3).